| December |
|
|
 |
 |
 |
Elevation |
Entrance,GF |
Basement Drive Way |
| |
|
|
 |
 |
 |
Typical Lobby |
Basement Parking |
Ladies Wash Room |
| |
|
|
 |
 |
 |
Gents Wash Room |
GF,Retail |
HC Toiliet |
| |
|
|
 |
 |
 |
Typical office,pantry |
GF,Lobby |
Elevation |
| |
|
|
| |
|
|
| |
|
|
| November |
|
|
 |
 |
 |
Elevation |
Epoxy Flooring in the Basements |
Elevation |
| |
|
|
 |
 |
 |
Epoxy FLooring in Basements |
G.FLoor Retail Passage |
Fire Escape Staircase |
| |
|
|
| |
|
|
| |
|
|
| October |
|
|
 |
 |
 |
| Typical office toilet & pantry |
Typical Floor Lobby |
Terrazo tiles @ stair
|
| |
|
|
 |
 |
 |
| Pump Room
|
Elevation |
Ground Floor |
| |
|
|
 |
 |
 |
Elevation |
Basement 3 |
Elevation |
| |
|
|
| |
|
|
| |
|
|
| September |
|
|
 |
 |
 |
Elevation |
Electrical Room
|
Lifts |
| |
|
|
 |
 |
 |
| Lift Lobby Finishes at 10th Floor |
Elevation |
IMG_2612 |
| |
|
|
 |
 |
 |
| Ground FLoor Services |
Ground FLoor Retail area
|
Elevation |
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| August |
|
|
 |
 |
 |
| Corridor |
False Ceiling Grid Works at 15th Floor
|
Wall Tiling Works |
| |
|
|
 |
 |
 |
| Terrazzo tiles at Staircase
|
Sanitary Fixing in Toilets at 7th Floor |
Office finishes
|
| |
|
|
 |
 |
 |
| Garbage chute
|
False ceiling Works at 12th Floor |
Elevation |
| |
|
|
| |
|
|
| |
|
|
| July |
|
|
 |
 |
 |
False Ceiling Works in Lift Lobby |
Toilet Finish |
Floor Tiling in Corridor |
| |
|
|
 |
 |
 |
Elevation |
Elevation |
Elevation |
| |
|
|
 |
 |
 |
Ceiling Finish in Lift Lobby |
Office Finishes |
Pantry Finish in Office |
| |
|
|
| |
|
|
| |
|
|
| June |
|
|
 |
 |
 |
Elevation |
Elevation |
Elevation |
| |
|
|
 |
 |
 |
Ceiling Finish in Lift Lobby |
False Ceiling Works in Lift Lobby |
Floor Tiling in Corridor |
| |
|
|
 |
 |
 |
Office Finishes |
Pantry Finish in Office |
Toilet Finish |
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| May |
|
|
 |
 |
 |
Wall Tiling in Lift Lobby |
MEP services |
Floor Tiling in Toilets |
| |
|
|
 |
 |
 |
Floor Screeding |
Elevation |
Elevation |
| |
|
|
| |
|
|
| |
|
|
| April |
|
|
 |
 |
 |
Blockwork at 32nd Floor |
Plastering Works |
MEP services in Lift Lobby |
| |
|
|
 |
 |
 |
Wall tile works |
Blockwork at 33rd Floor |
Elevation |
| |
|
|
| |
|
|
| |
|
|
| Mar |
|
|
 |
 |
 |
Floor Screed |
Blockwork at 30th-FLoor Level |
Elevation |
| |
|
|
 |
 |
 |
Plastering Works in 25th-FLoor |
MEP Works in Offices |
MEP Works in Lift Lobby |
| |
|
|
| |
|
|
| |
|
|
| Feb |
|
|
 |
 |
 |
Plaster Works in Toilets and Pantry |
Plaster works in Office |
Lift Supporting Works
|
| |
|
|
 |
 |
 |
| Block Works |
MEP Works in Lift Lobby |
MEP Works in Office
|
| |
|
|
| |
|
|
| Jan |
|
|
 |
 |
 |
Rear Elevation |
Front ELevation |
Core Wall & Slab |
| |
|
|
 |
 |
 |
Substation Works |
Slide ELevation |
Slide ELevation |
| |
|
|
| |
|
|